Get 20% off this month when you try our services!
Get 20% off this month when you try our services!
Headgates Noxious Weed Spraying
Culvert Crossings Easement Mowing
Right of Way Access
Ditch repair
Pipe Line Installation
Rules & Regulations
Water Rights
Encroachment Permit
Land Splits
Lessee / Leaser agreements
Right of Ways
Application for employment
Right-of-Ways
Rule 5-a
Main Canal, 60' low side, 40' Upper side...100' total
Laterals (30+ cfs) each side...60' total
Laterals (-30 cfs) 25' each side...50' total
Laterals(-15 cfs) 15' each side ...30' total
Main Waste Ditches 25' each side...50' total
Type 30 Waste Ditch 20' each side...40' total
Type 8 Waste Ditch 10' each side...20' total
These are required on all canals, Laterals, Open and Closed Drains owned by the United States, whatever right-of-way is required and necessary for the operation and maintenance of the system, whether it be more or less than set forth above. In a few cases owing to borrow pits, a greater width shall be required in order to provide a proper roadway, while in other cases the entire width may not be required and can be used by the adjacent land owner, subject to approval and the needs of the District. Provided, that houses and other buildings , trees and other permanent structures may not be placed on said Right-of-Ways
Rule 5-b
O&M Roads
The United States requires complete unobstructed access to all canals, laterals and drains operated by it or operated by the Huntley Project Irrigation District under contract. These roads are not maintained for public access , however the water users in the re day-to-day operations required for farming may use them. No persons may place temporary or permanent obstructions across and O&M road of the United States.
Below you will find a full copy of Rules & Regulations
(406)-672-5245
(406)-672-5247
(406)-672-5246
(406)-672-5243
(406) 672-5248
(406) 967-3400
Serving Water Users For over a 100 years
Huntley Project Irrigation District 2291 2nd Street West Ballantine, MT 59006 US
Open today | 07:00 am – 04:30 pm |
Encroachment Permit
If you need to encroach on our ROW's or cross our canals or laterals, an encroachment permit must be completed and returned to the office for Board approval before any work can begin.
Copyright © 2024 Huntley Project Irrigation District - All Rights Reserved.
Powered by GoDaddy Website Builder